您的当前位置:首页大体积混凝土测温记录1

大体积混凝土测温记录1

2021-09-23 来源:小侦探旅游网
大体积混凝土结构测温记录工程名称干灰库结构部位基础砼强度等级C30配合比编号HDBJ/HP/2009-0砼数量(m)3456砼浇灌日期2009.06.13测温时间气温(℃)(年、月、日)(时、分)表中下表1测点温度2中下表3中下施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称干灰库结构部位基础砼强度等级C30配合比编号HDBJ/HP/2009-0砼数量(m)3456砼浇灌日期2009.06.13测温时间气温(℃)(年、月、日)(时、分)表中下表4测点温度5中下表中下施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.7.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.2402:0006:0010:0014:0018:0022:002008.7.2502:0006:0010:0014:0018:0022:002008.7.2602:0006:0010:0014:0018:0022:00262536402625242326252522212330373525515053545045434139384539333540474540中66.766.766.666.566.566.366.266.266.16665.965.856.656.35655.555.154.6下54.354.354.354.254.254.15453.953.953.853.853.746.54645.845.445.144.7表5150535450454341393845393335404745401测点温度3中67.567.567.467.367.36766.766.866.666.466.36665.765.865.665.465.365下57.557.457.357.257.956.956.756.659.556.355.355.555.65655.955.955.855.6表5150535450454341393845393335404745404中68.968.668.568.368.26867.767.667.466.56766.866.466.366.165.565.665.3下5756.956.956.856.756.456.456.455.356.456.256.155.555.855.855.755.655.4施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.2702:0006:0010:0014:0018:0022:002008.7.2802:0006:0010:0014:0018:0022:002008.7.2902:0006:0010:0014:0018:0022:00222029363027281824262418151625262830363540454342403538403534343535343333中5453.653.252.752.451.85150.950.550.149.848.948.448.34847.647.346.8下44.54443.643.343.142.74342.141.941.641.441.140.540.540.24039.839.5表363540454342403538403534343635353533测点温度12中64.564.664.464.264.163.963.863.463.363.16362.762.562.361.961.961.861.6下52.752.552.852.752.652.55352.352.252.152.151.951.951.851.751.651.651.5表3635404543424035384035343436363636333中65.864.564.464.26463.763.563.16362.862.662.362.161.861.461.361.760.9下55.555455.355.255.15554.854.654.754.554.554.354.254.15453.753.953.7施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)1810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.3002:0006:0010:0014:0018:0022:002008.7.3102:0006:0010:0014:0018:0022:002008.8.0102:0006:0010:0014:0018:0022:0020213032252018222832262118212627261630313639363031333739363633中46.54645.745.345.144.641.243.843.543.242.842.541.8下403938.838.638.13837.537.637.437.136.936.736.536.336.23635.935.1表30313639363031333739363642.542.141.341.642.542.41测点温度2中61.6616160.860.560.460.26059.859.659.359.15958.758.658.458.257.9下51.551.351.351.251.35150.950.850.850.750.650.550.550.350.350.250.150表30313639363031333739373639.539.338.539.340.539.93中60.560.460.259.959.759.559.25958.858.558.358.157.957.657.457.25756.8下53.653.453.553.453.353.25352.952.952.852.552.552.552.352.252.15251.833.141.932.4141.632.332.932.941.341.140.6施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)测温时间气温(℃)表2008.8.0202:0006:0010:0014:0018:0022:002008.8.0302:0006:0010:0014:0018:0022:002008.8.0402:0006:0010:0014:0018:0022:00141526282619141526282523192426282215321810砼浇灌日期测点温度2008.07.171中40.4下35.235.435.335.235.134.834.734.634.534.434.334.23433.933.733.733.633.5表41.540.239.540.541.541.840.94039.339.840.741.341.241.141.241.940.140.52中57.757.557.457.257.156.856.456.356.256.15.955.755.655.35554.954.854.6下49.949.849.849.749.749.649.549.449.349.349.249.14948.848.748.648.648.5表38.237.236.737.939.839.73737.436.537.538.839.23938.939.439.639.839.53中56.556.456.25655.855.455.955.25554.854.754.554.354.153.953.753.553.3下51.751.651.651.551.451.351.25150.350.850.750.650.550.450.250.15049.9(年、月、日)(时、分)31.340.230.6403139.731.539.531.939.3313930.93830.438.630.438.330.938.131.437.931.337.832.137.532.332.131.431.337.936.936.936.8施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)1810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.8.0502:0006:0010:0014:0018:0022:002008.8.0602:0006:0010:0014:0018:0022:002008.8.0702:0006:0010:0014:0018:0022:001516282824201822283028211720272923.323.3中下33.733.333.233.13332.932.832.732.632.532.132.332.332.13231.83028表39.53938.739.239.739.63938.33838.84040.64039.538.939.338361测点温度2中50.554.254.15453.753.653.453.253.15352.852.652.552.352.1525050下49.648.348.348.148.14847.947.847.847.747.647.547.447.347.347.24340表3736.736.237.238.33836.935.935.837.439.635.93938.338.838.53838.13中53.25352.852.752.452.35251.951.851.751.551.351.25150.950.74847下49.949.749.649.649.449.349.1494948.948.848.748.648.548.548.3484629.936.629.736.429.236.329.336.230303635.929.535.72935.528.835.429.135.330.235.230.13530.134.93029.529.5282834.734.634.53330施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.2020:0022:000:002008.7.212:004:006:008:0010:0012:0014:0016:0018:002008.7.2220:0022:000:002:004:006:00292828272225333840322328262624242424565555565152535555555553505148474545中6464.164.764.965.365.565.76666.266.366.566.669.669.569.569.469.469.3下5959.159.259.459.559.359.359.359.359.359.259.257.657.657.657.958.257.4表60.160.560.460.160.460.560.660.660.560.96160.85150484745454测点温度5中66.96767.26767.567.567.767.867.9686868.168.268.268.268.168.168.1下5757.2575757.157.257.257.257.257.257.257.256.856.856.856.756.756.7表5655555451525353555555535150484745456中65.96666.166.166.366.366.666.766.866.866.866.866.966.766.866.866.866.7下56.456.556.456.356.456.556.456.456.456.456.356.355.755.755.655.555.555.5施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.2310:0014:0018:0022:002432384253615453中69.369.269.269.1下57.457.357.257.1表536154534测点温度5中6867.967.867.7下56.656.656.556.4表536154536中66.766.666.566.3下55.455.355.355.12008.7.242:006:0010:0014:0018:0022:0033403230292826273942372751505354504543413938453968.968.668.568.368.26867.767.667.466.56766.85756.956.956.856.756.456.456.456.356.456.256.151505354504543413938453967.667.567.367.167.966.866.566.466.46665.965.756.356.356.256.156.15655.955.856.355.755.655.551505354504543413938453966.266.165.965.765.665.465.265.164.964.564.564.2555554.954.854.754.654.354.154.454.354.254.12008.7.252:006:0010:0014:0018:0022:00施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)1810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.262:006:0010:0014:0018:0022:002008.7.272:006:0010:0014:0018:0022:002008.7.282:006:0010:0014:0018:0022:00212330373525222029363027281824262418212330373525222029363027403538403534中66.466.366.165.565.665.36564.964.664.364.263.8646363.262.862.562.2下55.555.855.855.755.655.455.255.15554.954.854.654.954.354.2545453.8表3335404745403635404543424035384035344测点温度5中65.665.265.164.964.764.46463.963.763.563.36362.762.562.362.161.961.6下55.455.355.355.255.154.954.854.754.554.454.354.253.753.653.853.753.653.4表3335404745403635404543424035384035346中64.163.963.863.663.46362.862.662.562.362.264.944.844.243.542.842.541.8下5453.953.953.853.653.55455.253.152.952.852.752.552.352.352.15251.8施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.292:006:0010:0014:0018:0022:002008.7.302:006:0010:0014:0018:0022:002008.7.312:006:0010:0014:0018:0022:00151625262830202130322520182228322621343636363633303136393630313337393736中61.961.761.661.26160.760.560.159.959.659.459.15958.558.35857.757.4下53.853.653.553.453.350.25352.952.852.752.652.552.452.352.152.151.951.8表3436363636333031363936303133373937364测点温度5中61.461.16060.660.460.26059.759.559.258.958.758.558.25857.757.457.2下53.353.253.15352.952.752.752.552.452.352.252.15251.851.851.651.551.4表3436363636333031363936303133373937366中41.542.239.939.74040.158.858.758.458.25857.757.557.25756.856.556.3下51.751.651.451.351.351.150.950.850.750.650.550.450.250.15049.949.849.7施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.8.012:006:0010:0014:0018:0022:002008.8.022:006:0010:0014:0018:0022:002008.8.032:006:0010:0014:0018:0022:00182126272616141526282619141526282523中下51.851.651.551.451.351.151.150.850.850.750.650.450.350.250.15049.949.7表3837.937.13839.333.834.136.135.438.338.538.83736.135.236.337.537.94测点温度5中56.956.756.556.356.155.855.655.455.254.954.954.554.354.25453.853.753.4下51.551.151.150.950.850.750.550.450.450.250.15049.949.849.749.649.549.4表39.840.439.64040.740.440.138.437.838.639.439.53431.937.33838.939.36中5655.855.755.555.3555554.654.454.354.153.953.553.453.353.152.952.7下49.649.449.349.249.148.948.948.748.648.548.448.248.1484847.947.847.736.256.836.556.93656.737.256.538.656.237.955.736.255.535.155.434.655.335.855.63754.837.254.33554.234.854.134.235.73737.253.953.753.553.3施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.8.042:006:0010:0014:0018:0022:002008.8.052:006:0010:0014:0018:0022:002008.8.062:006:0010:0014:0018:0022:0019242628221515162828242018222830282137中23.2下49.649.549.349.249.14948.948.848.748.648.448.248.248.148.14847.547.7表37.637.537.838.538.738.64测点温度5中53.353.15352.752.452.3下49.349.14948.948.848.348.748.548.448.348.248.14847.947.847.747.647.4表39.138.939.339.539.639.537.937.536.736.837.437.236.636.335.936.237.337.86中52.552.45251.951.751.651.451.25150.950.650.550.350.15049.849.749.5下47.647.447.247.1474746.846.746.746.646.446.346.246.14645.945.845.737.352.837.852.63852.338.352.137.95234.951.834.551.63451.435.85235.451.834.751.735.251.636.651.436.551.235.651.134.750.834.435.43737.550.750.550.450.235.251.336.45136.349.934.85033.950.533.835.737.737.750.350.25049.8施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.8.072:006:0010:0014:0018:0020:001720272923234中下47.647.547.447.247.547表36.535.73535.934.934.5测点温度5中5049.949.749.549.749下47.347.247.24747.147表3736.736.136.536.8366中49.449.14948.84948下45.645.545.445.3454536.549.735.249.534.549.335.949.135.149.13549施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.2020:0022:000:002008.7.212:004:006:008:0010:0012:0014:0016:0018:002008.7.2120:0022:000:002:004:006:00292828272225333840322328262624242424565555535152535355555553554842434544中64.664.864.864.76565.265.265.265.365.365.465.365.365.165.365.465.365.4下54.454.554.454.354.454.554.454.354.353.654.354.254.154.1545454.554.8表测点温度7中下表中下施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)1810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.218:0010:0012:0014:0016:0018:002008.7.2220:0022:002008.7.2300:002:004:006:0010:0014:0018:0022:002432384233403230292826273942372745445258555551504847454553615453中65.165.165.1656564.964.864.764.764.564.464.464.26463.863.4下53.853.853.753.653.553.453.353.25353.953.853.852.652.452.251.9表7测点温度中下表中下施工负责人:    技术负责人:   测温员:测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.242:006:0010:0014:0018:0022:002008.7.252:006:0010:0014:0018:0022:002008.7.262:006:0010:0014:0018:0022:00334032302928262739423727212330373525515053545045434139384539333540474540中63.263.162.762.462.461.861.561.160.760.561.260.159.559.158.958.558.257.8下51.551.651.551.252.450.850.750.550.350.150.45049.549.34948.748.448.1表1测点温度2中下表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)1810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.272:006:0010:0014:0018:0022:002008.7.282:006:0010:0014:0018:0022:002008.7.292:006:0010:0014:0018:0022:00222029363027281824262418151625262830363540454342403538403534343636363633中57.55756.756.45655.654.954.854.654.253.953.55352.652.55251.851.4下47.647.547.34746.946.646.346.145.945.745.645.34544.944.844.644.444.2表1测点温度2中下表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.7.302:006:0010:0014:0018:0022:002:006:0010:0014:0018:0022:002008.8.012:006:0010:0014:0018:0022:00202130322520182228322621182126272616303136393530313337393838中55150.750.35049.849.449.148.748.34847.747.4下43.943.843.743.543.343.24342.842.742.542.342.141.941.841.741.541.441.1表1测点温度2中下表3中下33.546.733.146.832.43435.534.446.546.34645.6施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)31810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.8.022:006:0010:0014:0018:0022:002008.8.032:006:0010:0014:0018:0022:002008.8.0402:0006:0010:0014:0018:0022:0014152628261914152628252318212627261633中45.3下4140.840.740.440.540.240.139.939.839.739.639.439.23938.938.838.638.5表7测点温度中下表中下31.145.230.644.932.944.734.544.534.744.133.243.93143.730.543.432.443.233.8433442.733.542.732.142.532.933.834.934.242.141.741.541.4施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机结构部位汽机基座底板砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)1810砼浇灌日期2008.07.17测温时间气温(℃)(年、月、日)(时、分)表2008.8.0502:0006:0010:0014:0018:0022:002008.8.0602:0006:0010:0014:0018:0022:002008.8.0702:0006:0010:0014:0018:0022:001516282824201822283028211720272923.323.3中下38.338.238.13837.837.737.637.837.437.337.23736.936.836.636.53635表7测点温度 中下表 中下30.641.130.540.930.240.831.440.532.140.331.940.23039.929.639.829.639.731.239.53339.432.839.231.539.530.438.829.631303038.738.53736施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机上部结构结构部位Ⅲ~Ⅳ轴7.75米梁砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)3175砼浇灌日期2008.11.12测温时间气温(℃)(年、月、日)(时、分)表2008.11.1302:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:0000:00-7-8-8-7-5-5-3-3-4-4-4-5253032353637404143434546中283440434546495051515252下263337394041434445454646表2430333536374042434445451测点温度2中253037394041444546464747下242932343536373839394041表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机上部结构结构部位Ⅲ~Ⅳ轴7.75米梁砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)175砼浇灌日期2008.11.12测温时间气温(℃)(年、月、日)(时、分)表2008.11.1402:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:0000:00-3-4-6-5-4-2110-1-1-2474950505051515151505050中535354545454545453535353下464647474747474747464646表4748494949495050505050501测点温度2中484850505051515151515151下414242424242424242424242表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机上部结构结构部位Ⅲ~Ⅳ轴7.75米梁砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)175砼浇灌日期2008.11.12测温时间气温(℃)(年、月、日)(时、分)表2008.11.1502:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:0000:00-6-5-4-5-4-4-5-7-7-8-8-8504949494949484847474646中53535352.55251515150504949下464545444444434343424241表505050504949494948484747测点温度12中515151515050505049494848下424242424242414141404040表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机上部结构结构部位Ⅲ~Ⅳ轴7.75米梁砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)175砼浇灌日期2008.11.12测温时间气温(℃)(年、月、日)(时、分)表2008.11.1602:0004:0006:0008:0010:0012:0014:0018:0020:0022:0000:00-11-11-11-10-9-8-8-10-10-10-124545444444434241414039中4948484747474645444242下4140403939383736353434表4746464545444343414039测点温度12中4848474747464544434342下4039393838373635343433表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机上部结构结构部位Ⅲ~Ⅳ轴7.75米梁砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m3)175砼浇灌日期2008.11.12测温时间气温(℃)(年、月、日)(时、分)表2008.11.1702:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:00-16-16-15-14-13-10-10-11-13-16-173938383737中4241414040下3434333333表3939383838测点温度12中4241414040下3333323232表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号大体积混凝土结构测温记录工程名称汽轮发电机上部结构结构部位Ⅲ~Ⅳ轴7.75米梁砼强度等级C30配合比编号HDBJ/HP/2008-0砼数量(m)3175砼浇灌日期2008.11.12测温时间气温(℃)(年、月、日)(时、分)表中下表1测点温度2中下表3中下施工负责人:    技术负责人:   测温员: 测温仪名称及计量编号

因篇幅问题不能全部显示,请点此查看更多更全内容